Skip to main content

Renovations

Room-by-Room and Whole-Property Renovation Work

A renovation is really a sequence problem. Any single trade in it is straightforward on its own; what decides whether the job runs to time is the order things happen in, and what has to be finished before the next stage can start.

MR HANDY takes on renovation work room by room or across a whole property — kitchens, bathrooms, tiling, flooring, plastering, joinery and decorating, handled as one job with one person accountable for it. Gas, notifiable electrical work and bathroom plumbing connections are carried out by registered trades and scheduled into the sequence rather than left to chance.

Property Renovations carried out by MR HANDY

What's Included

What We Can Help With

The work most often requested under renovations.
  • Kitchen renovations
  • Bathroom renovations
  • Wall and floor tiling
  • Flooring throughout a property
  • Plastering and skimming
  • Painting and decorating
  • Joinery, skirting and architrave
  • Wall repairs and making good
  • Removing old kitchens, bathrooms and fittings
  • General building and maintenance work
  • Preparing a property before sale or letting

Worth Knowing

Sequence Is What Makes a Renovation Work

Work runs from the messiest trade to the most delicate. Strip-out first, then anything structural, then first-fix services while the walls are still open, then plastering, then flooring, then second-fix, and decorating last. Decorating last is not a preference — paint applied before the dust-making trades have finished simply gets done twice.

Bathrooms are the tightest sequence of the lot. Tiling cannot start until the walls are sound and the pipework is set, and the pipework position depends on the actual sanitaryware being on site rather than assumed from a brochure. Getting everything ordered before the first day is worth more than it sounds, because one missing waste kit can stop a bathroom for a week.

Tiling deserves its own attention because it is unforgiving. Tiles follow the wall behind them, so an out-of-plumb wall shows up in every grout line, and the first row sets the alignment for everything above it. On floors the substrate has to be rigid — tiles laid over a floor that flexes will crack along the joints whatever adhesive is used.

Where a renovation involves gas, new circuits or consumer unit work, that is notifiable work for a registered installer, and bathroom plumbing connections need the right trade too. Those slots are planned into the programme early, because finding them halfway through means finished work coming back out.

In Practice

Typical Jobs

Real examples of the kind of job this covers.
  • Renovating a bathroom from strip-out through to decorating
  • Refitting a kitchen including flooring and tiling
  • Tiling a bathroom, splashback or kitchen wall
  • Bringing a tired room back with plastering, flooring and decorating
  • Renovating a property room by room while it stays occupied
  • Preparing an inherited or empty property for sale

Gallery

Renovations Work

Photographs of completed jobs as work is documented.
  • Bathroom stripped back before renovation
  • Wall tiling in progress
  • Newly tiled bathroom floor
  • Kitchen renovation nearing completion
  • Replastered and decorated room
  • Completed renovation

Why MR HANDY

Why Use MR HANDY for Renovation Work

You deal with one person across the whole job rather than coordinating separate trades yourself. Where a registered trade is needed it is identified at quote stage and booked into the sequence, so you know who is doing what and when.

The programme is set out honestly, including which parts of the property will be out of use and for how long. A bathroom that is unusable for a fortnight is manageable when it is expected and a serious problem when it is not.

Request a Quote

Available Across

Renovations is carried out for homeowners and landlords across every area listed here.

Just outside these areas? Ask — coverage is not a hard boundary.

Questions

Renovations FAQs

If your question is not here, ask — you will get a straight answer.
How long does a bathroom renovation take?
Most domestic bathrooms are a one to two week programme once all the materials are on site, but the honest answer depends on what comes off the walls. A straight swap of like-for-like sanitaryware is quick; discovering rotten timber or failed plaster behind the old tiles adds days. You will get a realistic programme rather than an optimistic one.
Do you handle the plumbing and electrics as well?
Not the notifiable parts. Gas work needs a Gas Safe registered engineer and new circuits or consumer unit work need a registered electrician, and bathroom plumbing connections are done by the appropriate trade. Everything around them — strip-out, walls, tiling, flooring, joinery and decorating — is covered, and the specialist slots are planned into the sequence so nothing has to come back out.
Can we stay in the property while the work is done?
Usually yes, provided the work is sequenced room by room. A single bathroom is the awkward case, because there will be a period without it — if that is a problem it is worth saying at quote stage so the programme can be compressed around it.
Do you take on tiling as a job on its own?
Yes. Tiling does not have to be part of a full renovation — a bathroom retile, a kitchen splashback or a tiled floor are all fine as standalone jobs. Tell us the area and the tile you have chosen, because tile size and format change both the preparation and the time.
Can you renovate one room rather than a whole house?
Yes, and it is the most common request. A single room brought properly up to standard is often better value than spreading a budget thinly across a whole property.

Need Renovations Doing?

Send a description or a few photographs and you will get a clear, no-obligation price.

Call NowFree Quote